摘要
通过对复合地层中采取有效措施成功使复合式TBM脱困的案例分析,找出复合式TBM被卡的原因,并提出相关对策,从而为以后的TBM施工提供宝贵经验。
According to the analysis of the composite TBM difficulty-relief cases by adopting effective measures in the composite strata,the study locates the reasons for the jamming shield of the composite TBM,and points out the relative strategies,so as to provide the precious experience for the future TBM construction.
出处
《山西建筑》
2012年第12期201-203,共3页
Shanxi Architecture
关键词
TBM
卡盾
原因分析
脱困
TBM
jamming shield
analysis of reasons
difficulty-relief