摘要
结合某能源集团修建的巴准线巴图塔至点岱沟段某隧道的修建实例,对铁路隧道穿越古煤矿采空区这一现象进行了分析,并提出了科学的处治方法。
Combined with the construction example of a tunnel from Batuta to Diandaigou in an energy group, railway tunnel passing through mined- out area wa~ analy^ed, and scientific treatment measures were put forward.
出处
《价值工程》
2012年第12期87-88,共2页
Value Engineering
关键词
隧道
穿越
采空区
安全
施工技术
tunnel
pass through
mined-out area
security
construction technology