根据大型铸件结构,设计浇冒口系统。采用了7炉同时熔炼、双漏包铁液从两端浇注的工艺,解决了铸造车间不能独立铸造大型铸件的难题。通过生产实践,取得了良好的效果。
The running and feeding system have been designed upon large casting structure, lne puzzle that large casting unable to be cast by foundry shop itself has been solved with technology that melting by 7 furnaces at the same time and pouring from both ends by 2 bottom pour ladles, with favorable effect gained in practice.
出处
《中国铸造装备与技术》
CAS
2012年第2期18-20,共3页
China Foundry Machinery & Technology
关键词
中频炉
浇冒口
漏包浇注
Medium frequency furnace
Gating and Risering
Bottom pour ladle cast