摘要 河3-支平1井为双分支水平井,钻探目的是利用分支水平井技术完善区块开发效果。采用了主套管窗口液力密封技术,通过在主套管内开窗后,主井眼内下入母板,分支井眼内下入分支井眼连接器,并通过分支井眼连接器上的密封实现了窗口连接处的液力密封性能,同时实现了后期投产施工时分支井眼的选择性再进入。河3-支平1井达到了五级分支井完井水平,满足了该区块的开发需要。 Well He3-zp1 is a dual-lateral horizontal well.The exploration drilling of this well aimed at improving the zonal exploiting effects by applying lateral horizontal well technology.Adopting the liquid sealing technology at the main casing window,the mother template was laid in the main hole after internal window opened in main casing,and then the lateral connector was run in the lateral holes.Great liquid sealing capability at the window junction was made by the sealing in the lateral connector,at the same time;the selective re-entry of lateral hole can be achieved during the production operation of post-stage.The technology applied in Well He3-ZP1 has achieved 5 levels multilateral well completion standard,which met the need of zonal exploitation in this area.
出处 《石油钻采工艺》 CAS CSCD 北大核心 2012年第2期13-16,共4页 Oil Drilling & Production Technology
基金 国家科技重大专项"复杂结构井钻井配套技术"(编号:2011ZX05022-002)部分研究成果
关键词 河3-支平1井 五级分支水平井 钻完井工艺 胜利油田 Well He3-zp1 5 levels multi-lateral horizontal wells drilling & completing techniques Shenli oilfield
  • 相关文献

参考文献6

二级参考文献20

  • 1林平一.油藏工程[M].北京:石油工业出版社,1990..
  • 2[1]Brister A R. Analyzing a Multilateral - Well Failure in the East Wilmington Field of California. SPE Drilling & Completion, 1998 - 09:131 ~ 135
  • 3[2]Winton G Aubert. Variations in Multilateral - Well Design and Execution. JPT, 1998 -06:30 ~ 32
  • 4[3]Waddell K. Determining the Risk in Applying Multilateral Technology. JPT, 1999 -07:42 ~43
  • 5[4]Horn M J, Plathey D P,Ouahiba Ibrahim. Multilateral Horizontal Well Increases Liquids Recovery in the Gulf of Thailand. SPE Drilling&Completion, 1998 - 06:78 ~ 86
  • 6[5]Alan Mackenzie, Cliff Hogg. Multilateral Classification System with Example Applications. World Oil, 1999 -01:55 ~ 61
  • 7[7]Steele David J, Steinar Edholm. Through - Tubing Junction- Isolation System Enables High- Pressure Stimulation. JPT, 2001 - 06:35 ~ 36
  • 8吴敬涛,王振光,崔洪祥.两口阶梯式水平井的设计与施工[J].石油钻探技术,1997,25(2):1-4. 被引量:15
  • 9刘汝山,王宝新,王振光,都振川.胜利油田水平井钻井技术[J].石油钻探技术,1999,27(5):27-29. 被引量:17
  • 10都振川,秦利民,周跃云.埕北21-平1大位移水平井的设计与施工[J].石油钻探技术,2000,28(5):9-11. 被引量:29

共引文献77

同被引文献120

引证文献10

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部