摘要
三里坪大坝灌浆工程内容多,工作量大,为保质保量完成各项灌浆工作,监理人员按合同要求,对灌浆工程的质量进度进行严格控制,针对具体情况制定相应的控制措施取得了满意的效果。重点介绍了大坝灌浆工程的统筹安排与进度控制和大坝灌浆工程质量控制要点及有关问题处理,对大坝灌浆工程质量检查检测结果和质量保证条件进行了分析。
Due to plenty of items and quantities in grouting project of Sanliping Dam,the strict quality and progress controlling by supervising engineers according to the contracts,and the control measures made in view of the specific conditions ensured the completion of each item of grouting works efficiently.The overall arrangement and progress control of the grouting project,and control points of project quality as well as the solutions to the related problems are focused.Moreover,results of quality inspection and conditions of quality assurance are also analyzed.
出处
《人民长江》
北大核心
2012年第6期14-16,共3页
Yangtze River
关键词
灌浆工程
监理
质量进度
进度控制
三里坪大坝
grouting project
supervision
quality and progress
progress control
Sanliping Dam