季节冻土地区深基坑桩锚支护体系安全性研究 被引量:11

Study on the security of a ultra-deep foundation pit with the pile-anchor support structure in the seasonal frozen earth
下载PDF
导出
摘要 通过对某越冬深基坑工程的现场监测,分析了基坑工程水平变形情况,研究了冬季基坑水平变形的原因.监测结果表明:桩锚支护超深基坑水平位移已超过现行地方规定,但支护体系的安全性仍可满足要求,应进一步结合该地区其他超深基坑的监测结果分析,提出该地区桩锚支护体系安全预警指标;冻融循环会引起锚索预应力损失,使桩锚支护超深基坑产生较为明显的水平位移,影响基坑安全.因此,在越冬基坑设计和施工组织等方面,应综合考虑坑壁保温、地表排水和桩后土体排水等问题,降低冻融循环的不利影响. Through on-site monitoring methods for the pit,the current cttsplace,,~ overwinter displacement of pit were studied. The results show that the horizontal dis- placement of ultra-deep pit with pile-anchor program is beyond the present locality code,but its security is suitable. Therefore,a new security index of this pit must be put forward to monitoring the result of other pits. The anchor prestressing is lost by freeze- thaw ,and the horizontal displacement of pit is obviously increased and the security of pit is effected. The overwinter pit must be studied to reduce disadvantages during the de- sign and construction. For example, the heat preservation of slope,could be done, and draining water could be removed from soils on the backside pile and on the surface of the earth.
作者 王家伟
出处 《交通科学与工程》 2012年第1期52-55,83,共5页 Journal of Transport Science and Engineering
关键词 基坑工程 桩锚支护 监测 冻融 deep foundation pit engineering pile anchor support structure monitoring freeze-thaw
  • 相关文献

参考文献8

二级参考文献35

  • 1刘欢,傅旭东.边坡稳定的三维极限平衡分析方法探讨[J].勘察科学技术,2005(1):10-12. 被引量:1
  • 2胡春林,陈琍,罗仁安,忻远跃.高层建筑深基坑开挖施工期的监测和险情预报[J].岩土力学,1996,17(2):64-69. 被引量:37
  • 3王红雨,杨敏.临近基坑条形基础地基承载力简化上限解[J].同济大学学报(自然科学版),2006,34(3):319-324. 被引量:13
  • 4曾国熙 潘秋元.软粘土地基基坑开挖性状的研究[J].岩土工程学报,1988,10(3).
  • 5Ito T, Matsui T, Hong W P. Design method for stabilizing piles against landslide-one row of piles [ J]. Soils and Foundations, 1981,21(1) :21 - 37.
  • 6Fei C, Keizo U. Response of flexible piles under laterally linear movement of the slide layer in landslides [ J ]. Can Geotech J, 2003,40 : 46 - 53.
  • 7Brandenberg S J, Boulanger R W, Kutter B L, et al. Behavior of pile foundations in laterally spreading ground during centrifuge tests [ J ]. Journal of Geotechnical and Geoenvironrnental Engineering, 2005, 131 ( 11 ) : 1378 - 1391.
  • 8Stewart D P. Design of piled bridge abutments on soft clay for loading from lateral soil movement[J]. Geotechnical, 1992, 44(2) :277 - 296.
  • 9俞建霖.软土地基深基坑工程数值分析研究[M].杭州浙江大学,1997..
  • 10祝斌.深基础施工中的监控信息化[J].建筑技术,1997,28(2):119-120. 被引量:5

共引文献302

同被引文献119

引证文献11

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部