广乐高速公路T10标段长基岭隧道为特长隧道,是广乐高速的控制性工程。隧道地层复杂、断层发育,开挖埋深浅、跨度大,采用的支护措施和结构形式复杂多样,施工中各种工法转换复杂。为保证隧道施工安全、经济进行,在施工过程中采用了全过程监控量测技术,保证了工程质量、施工安全及周围环境的安全。
Changjiing super-long tunnel in the area of bid section T10 of Guangle le highway is a dominant engineering.The tunnel area is characterized by a complex formations and a fault development.The tunnel has a big span and the burial depth is shallow.A variety of supporting measurements and structural style are adopted and many complex construction methods are converted.The monitoring measurement technology is used in the whole construction process to guarantee the engineering quality,the safety of construction and environment.
出处
《石家庄铁路职业技术学院学报》
2012年第1期46-52,共7页
Journal of Shijiazhuang Institute of Railway Technology