大型活动发射平台螺栓联接预紧力分析 被引量:2

Preload Analysis of Bolt-joint for the Large Mobile Launching Platforms
下载PDF
导出
摘要 大型活动发射平台采用框架结构,使用预紧螺栓连接各框架。总结了螺栓最小预紧力和最大预紧力的计算方法,提出采用ANSYS的装配技术和接触算法对螺栓预紧连接进行仿真,利用降温法模拟螺栓预紧力的方法。通过计算一系列螺栓预紧力,得到螺栓预紧力与两连接板轴向间距δ的关系曲线。此分析方法为复杂结构中螺栓连接的简化计算提供了参考,为大型活动发射平台连接螺栓预紧力的确定提供了依据。 The large mobile launching platforms adopt frame structure with the frames connected by preload bolts.This article summarizes the method for calculating the minimum and the maximum pre-tightening force of the bolt,simulates the pre-tightening force of the bolt-joint with assembled technology and contacted arithmetic,puts forward the method of simulating pre-tightening force of bolts with temperature-decrease method.Through calculating a series of pre-tightening force of bolts,the relation curves of the pre-tightening force of bolts and the axial spacing of connect plates is received.The analysis of pre-tightening force of bolts supplies the reference of bolt-joint simplified calculation for complex structure,confirms pre-tightening force of bolts for the large mobile launching platforms.
出处 《导弹与航天运载技术》 北大核心 2012年第2期14-16,共3页 Missiles and Space Vehicles
关键词 活动发射平台 螺栓预紧力 有限元分析 Mobile launching platforms Bolt pre-tightening force Finite element analysi
  • 相关文献

参考文献1

二级参考文献3

共引文献52

同被引文献11

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部