摘要
针对目前预应力混凝土桥梁由于多方面因素造成的预应力损失,基于静力平衡原理,通过横张增量法对实桥进行预张力测试,采用线性条件下二级间增量方式消除误差,得出实测桥梁的目标钢束现存应力,并与规范中理论设计值进行对比分析,确定在役桥梁预应力储备状况。研究结果表明:实测箱梁跨中8根正弯矩束中,有3根钢束有效预应力实测值小于设计值13.36%~23.7%,墩顶4根负弯矩束实测值较设计值大16.86%~24.59%,由此说明,PC箱梁预应力损失较严重,主梁刚度有所下降。
Aimed at the prestress loss on present prestressed concrete bridges,based on the principle of static equilibrium,a real bridge pre-tension was detected by horizontal tension-increment method,the intersecondary incremental way on linear condition was used to eliminate the errors.The existing stress value of target steel beam of service bridge was worked out and compared with the standard theoretical value.The results show that the effective prestress values of 3 beams among 8 positive moment beams in the measured box girder are less than the theoretical values from 13.36% to 23.7%,the measured values of 4 negative moment beams at pier top are bigger than the theoretical values from 16.86% to 24.59%,that indicates the prestress loss of PC girder bridge is more serious,the girder stiffness is declined.6 tabs,2 figs,9 refs.
出处
《长安大学学报(自然科学版)》
EI
CAS
CSCD
北大核心
2012年第2期70-73,81,共5页
Journal of Chang’an University(Natural Science Edition)
基金
交通运输部西部交通建设科技项目(2011 318 812 970)
中央高校基本科研业务费专项资金项目(CHD2011ZY003
CHD2012JC001
CHD2011TD010)
关键词
桥梁工程
PC梁桥
有效预应力测试
横张增量法
张力测试仪
bridge engineering
PC girder bridge
effective prestress test
horizontal tension-increment method
stretching force tester