4Rosenblatt M J, Lee H L. Economic production cycles with imperfect production process[J]. IIE Transactions, 1986, 18(1): 48 - 55.
5Porteus E L. Optimal lot sizing, process quality improvement and setup cost reduction[J]. Operations Research, 1986, 134:137- 144.
6Chung K J, Hou K L. An optimal production run time with imperfect production processes and allowable shortages[J]. Computers and Operations Research, 2003, 30: 483-490.
7Salameh M K, Jaber M Y. Economic production quantity model for items with imperfect quality[J]. International Journal of Production Economics, 2000, 64:59 - 64.
8LE C B. Observation on: Economic production quantity model for items with imperfect quality [ J]. International Journal of Production Economics, 2000, 67:201.
9Goyal S K, LE C B. Note on: Economic production quantity model for items with imperfect quality - a practical approach[J]. International Journal of Production Economics, 2002, 77: 85 - 87.
10Hayek P A, Salameh M K. Production lot sizing with the reworking of imperfect quality items produced[J]. Production Planning and Control, 2001, 12(6): 584-590.
2Gour Chandra Mahata,Adrijit Goswami.Fuzzy inventory models for items with imperfect quality and shortage backordering under crisp and fuzzy decision variables[J].Computers & Industrial Engineering.2013(1)
3Guowei Hua,T.C.E. Cheng,Shouyang Wang.Managing carbon footprints in inventory management[J].International Journal of Production Economics.2011(2)
4N. Kazemi,E. Ehsani,M.Y. Jaber.An inventory model with backorders with fuzzy parameters and decision variables[J].International Journal of Approximate Reasoning.2010(8)
5Shan Huo Chen,Shu Man Chang.Optimization of fuzzy production inventory model with unrepairable defective products[J].International Journal of Production Economics.2008(2)
6T. Vijayan,M. Kumaran.Fuzzy economic order time models with random demand[J].International Journal of Approximate Reasoning.2008(3)