3Fox R E.MRP,Kanban,or OPT:What's best?[J].Inventories and Production,1982,2(4):3-11.
4Ramsay M L,Brown S,Tabibzadeh K.Push,pull and squeeze shop floor control with computer simulation[J].Industrial Engineering,1990,22:39-45.
5Watson K J,Blackstone J H,&:Gardiner S C.The evolution of a management philosophy:the theory of constraints[J].Journal of Operations Management,2007,25(2):387-402.
6Plenert G.Focusing material requirements planning (mrp) towards performance[J].European Jour- nal of Operational Research,1999,119(1):91-99.
7Sivasubramanian R,Selladurai V,Rajamramasamy N.The effect of the drum-buffer-rope (dbr) approach on the performance of a synchronous manufacturing system (sms)[J],Production Planning &c Control,2010,11(8):820-824.
8Cook D P.A simulation comparison of traditional,JIT,and TOC manufacturing systems in a flow shop with bottlenecks[J].Production and Inventory Management Journal,1994,35:73-78.
9Radovilsky Z D.A quantitative approach to estimate the size of the time buffer in the theory of constraints[J].International Journal of Production Economics,1998,55(2):113-119.