期刊文献+

简述桥基冲孔灌注桩施工监理程序及质量控制要点 被引量:2

Supervision Program And Quality Control Gist Of Bridge Punching Bored Pile Construction
下载PDF
导出
摘要 结合监理实际经验,在深圳西部码头过渡段桥基冲孔灌注桩施工监理过程中,通过对工程隐蔽性及工序不可逆性的分析,制定出方案可行的监理程序及质量控制要点,对关键部位、重要工序实行监理巡视,全程旁站;对质量事故的前兆,存在的隐患做到事前控制,将质量事故消灭在萌芽之中。并且由责任心强、技术水平和能力高的专业监理工程师与监理员相互配合,严格监理,使桥基冲孔灌注桩施工质量得到了有效的控制和保证。 Combined with actual supervision quality control gist in the supervision process experience, this paper worked out feasible supervision program and of punching bored pile construction at the bridge base in changeover portion of west dock in Shenzhen city according to the analysis of engineering disguising and inconvertibility. The key component and important working process should perform supervision touring and whole course beside - standing, the quality accident premonition and hidden danger should be controlled in advance. The professional supervision engineer and personnel with strong responsibility and high technique and ability should interact to ensure and control the construction quality of bridge punching bored oile construction.
作者 车炜伟
出处 《林业科技情报》 2012年第1期96-97,共2页 Forestry Science and Technology Information
关键词 冲孔灌注桩施工 监理程序 质量控制要点 punching bored pile construction supervision program quality control gist
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部