摘要
石灰石—石膏湿法脱硫技术是我国燃煤电厂烟气脱硫的首选工艺,以电石渣代替石灰石进行烟气脱硫,可以达到废物利用、循环经济的目的。分析了以电石渣为脱硫剂时,系统运行存在的问题,并提出相关建议。
Now the limestone-gypsum wet FGD is becoming the first selectable flue gas desulfurization technology in our coal-burning power plants.If the absorbent limestone can be replaced by more inexpensive carbide slag,the waste canbe reused.and the cycle economy is reached.The problem excisted in the operation of carbide slag wet flue gas desulfurization are described,and some suggestion are presented.
出处
《电力科技与环保》
2012年第2期42-44,共3页
Electric Power Technology and Environmental Protection
关键词
电石渣
烟气脱硫
湿法
吸收剂
carbide slag
flue gas desulfurization
wet
absorbent