摘要 武钢1 580mm生产线粗轧R2入口推床在日常生产过程中出现多次油缸底层基础松动、地脚螺栓断裂的情况,造成设备损坏频繁,严重影响正常的生产和产品质量。虽做了几次修复加固,但仍无法彻底解决基础松动螺栓损坏的问题。为了彻底消除隐患,保证正常生产,针对粗轧R2入口推床基础螺栓断裂的问题,从根源入手分析查找原因,分别对油缸基础强度进行校核,液压系统进行综合分析以及电气控制程序进行全面分析优化,最终查找出问题根源,彻底解决了推床基础的问题,有效确保了R2入口推床的使用可靠性,保证了轧制节奏和稳定性,效果十分理想。 Defects such as looseness of foundation of the oil cylinder bottom and fracture of the foundation bolt frequently occur in the pushing lathe located at the R2 entry of the roughing line of 1 580 mm rolling mill in the daily production and thus accidents of the equipment damage take place repeatedly and the normal production and product quality are seriously affected.The problems of foundation looseness and bolt fracture could not be thoroughly solved even though repair and stiffening work ever conducted for a few times.In order to solve the hidden trouble completely and ensure the daily production properly,in light of the problem of the bolt fracture at the R2 entry of the roughing mill the strength of the oil cylinder bottom foundation was calibrated and the hydraulic system was comprehensively analyzed and the electrical control program fully checked and optimized and in the end the origin of the trouble was found out and the problems of foundation of the pushing lathe was thoroughly solved.The reliability of the usage of the pushing lathe at the R2 entry of the roughing mill and the tempo and stability of rolling can be ensured and the results are quite satisfactory since revamp.
出处 《武钢技术》 CAS 2012年第2期40-43,共4页 Wisco Technology
关键词 粗轧 入口推床 电液系统 roughing entry pushing lathe hydraulic and electric system
  • 相关文献

同被引文献13

  • 1胡贤磊,赵忠,刘相华,王国栋,阎智平.中厚钢板侧弯的形成原因分析[J].钢铁,2006,41(4):56-61. 被引量:24
  • 2Chen C Y,Liu L Q,Cheng C Cy et al. Fuzzy controllerdesign for synchronous motion in a dual-cylinder electro-hydraulic system[J]. Control Engineering Practice,2008,16(6):658 -673.
  • 3Saad K,Taher S E D,Siegfried H. Motion synchronizationenhancement of hydraulic servo cylinders for mouldoscillationf J ]. International Journal of Fluid Power,2012,13(1) :51 -60.
  • 4Li K, Mannan M A, Xu M, et al. Electro-hydraulicproportional control of twin-cylinder hydraulic elevators [ J ] .Control Engineering Practice,2001,9(4) :367 -373.
  • 5Keron Y. Cross-coupled biaxial computer control formanufacturing systems [ J ]. ASME Journal of DynamicSystems and Control, 1980,102(4) :265 - 272.
  • 6Hogan P, Burrows C R. Synchronizing unevenly-loadedhydraulic cylinders [ C ] //Proceedings of the 1994International Mechanical Engineering Congress andExposition. Los Alamitos ; IEEE, 1994 :75 -80.
  • 7Gao Q, Guan W L. Research on intelligent synchronizationcontrol of erecting system driven by two hydraulic cylinders[J]. Advanced Materials Research,2012,422 : 167 - 171.
  • 8韩光成,张永强,谯宗田.中板轧机推床故障的分析[J].甘肃冶金,2012,34(1):63-65. 被引量:2
  • 9张绍裘,吴冉泉,吴小洪,曾焕浪,樊昶明.带液压伺服补偿的等流量双泵同步系统的研究[J].液压气动与密封,2000,20(2):16-17. 被引量:2
  • 10高贞,郝古柱.热带卷取机对中装置的改进[J].重型机械,1990(6):60-62. 被引量:1

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部