摘要
根据王庄煤矿43M5运巷掘进遇到的实际情况,介绍了采用正台阶施工法过空巷大冒落区的施工方法,通过实践证明,与传统的施工方法相比,减轻了工人的劳动强度,保证了施工中的安全系数,提高了回采效率。
According to Wangzhuang 43M5 mine transportation roadway tunneling encountered the actual condition,introduces using Positive-step through empty roadway caving area construction method.Through the practice proved that,compared with the tradition construction method,reducing the labor intensity of the workers,ensureing the construction safety coefficient,improving the mining efficiency.
出处
《装备制造技术》
2012年第3期181-182,192,共3页
Equipment Manufacturing Technology
关键词
空巷
大冒落区
正台阶施工法
empty roadway
large roof falling zone
positive-step construction method