摘要
结合山平高速第十一合同段店坪大桥后张法施工的实际经验,从箱梁底模的制作到绑扎钢筋、养护等方面概要的阐述了预制混凝土箱梁的质量控制方法,对今后同类工程具有指导作用。
Combining the factual experience at the post-tension method construction at Dianping Bridge of No.11 contract section along Shan-Ping expressway,the paper illustrates the controlling methods for the quality of the precast concrete box girder from the manufacturing of the box girder base mould,the assembling reinforcement,and the maintenance,so as to have the direction for the similar projects in future.
出处
《山西建筑》
2012年第13期218-219,共2页
Shanxi Architecture
关键词
预制箱梁
配合比设计
波纹管定位
控制方法
precast box girder
design of proportional ratio
location of bellows
controlling methods