摘要
煤矿区建设项目全过程跟踪审计作为煤矿区建设项目基建工程审计的一种尝试和创新,在实践中已彰显出它的实用性、先进性和优越性,具有广阔的应用前景。全过程跟踪审计具有周期长、控制环节多、涉及面广、不确定因素多等特点。文章结合煤矿区建设项目基建工程审计工作实践,并综合全过程跟踪审计的风险分析,总结了煤矿区建设项目审计风险控制的措施和办法,仅供参考。
As a try and innovation of construction engineering audit,the whole process tracking audit has already revealed its practicability,advanctage and superiority in practice.The whole process tracking audit has the broad application prospect,and also has long life cycle,many control links,wide involving range,uncertain factors etc.This article combined the audit experience of coal mine construction projects and whole process tracking audit risk analysis,summarizes the audit risk control measures of the coal mine construction projects,and it is only for reference.
出处
《煤炭技术》
CAS
北大核心
2012年第4期137-139,共3页
Coal Technology
关键词
全过程跟踪审计
审计风险
风险控制
whole process of tracking audit
audit risk
risk control