期刊文献+

考虑库存损耗的单部件系统可修备件需求模型 被引量:3

Repairable spare parts demand model of single unit system with perishable inventory
下载PDF
导出
摘要 本文研究具有库存损耗的单部件系统可修备件需求模型;采用马尔可夫到达过程(Markovian删val p★cess,MAP)代替Poisson过程、更新过程等经典随机过程描述备件需求情况.假设库存备件寿命服从指数分布,故障件维修时间服从一般分布,建立了一种描述能力更强的可修备件需求模型;给出了系统的可用度、工作时间周期、停机时间周期等参数和规定条件下的两种备件需求量算法,并给出了数值算例说明所建模型的有效性. This paper investigates a repairable spare parts demand model of single unit system with perishable inventory. The spare parts demand process is described by Markovian arrival process (MAP), instead of Poisson process, renewal process or others typical stochastic process. The items in the inventory have random shelf time and follow an exponential distribution, and the repair times follow a general distribution. The paper presents a repairable spare parts demand model that can describe real situations better. And the availability, up and down period of this system, two algorithms to get the amount of spares under certain restriction are obtained. Finally, numerical examples are given to illustrate the effectiveness of the model.
出处 《系统工程学报》 CSCD 北大核心 2012年第2期270-278,共9页 Journal of Systems Engineering
基金 国家自然科学基金资助项目(70501031)
关键词 备件需求 库存损耗 马尔可夫到达过程 一般分布 spare parts demand perishable inventory Markovian arrival process general distribution
  • 相关文献

参考文献17

  • 1Goyal S K,Giri B C. Recent trends in modeling of deteriorating inventory[J].European Journal of Operational Research,2001,(01):1-16.doi:10.1016/S0377-2217(00)00248-4.
  • 2Isotupa K P S. An (s,Q) Markovian inventory system with lost sales and two demand classes[J].Mathematical and Computer Modelling,2006,(7/8):687-694.
  • 3Hill R M. Continuous-review,lost-sales inventory models with Poisson demand,a fixed lead time and no fixed order cost[J].European Journal of Operational Research,2007,(02):956-963.
  • 4于静,吴进煌.导弹武器装备备件数量计算方法研究[J].战术导弹技术,2003(2):56-60. 被引量:16
  • 5Nahmias S. On ordering perishable inventory under erlang demand[J].Naval Research Logistics,2006,(03):415-425.
  • 6Liu L M,Shi D H. An (s,S) Model for inventory with Exponential lifetimes and renewal demands[J].Naval Research Logistics,1999,(01):39-56.
  • 7Chakravarthy S R,Daniel J K. A Markovian inventory system with random shelf time and back orders[J].Computers & Industrial Engineering,2004,(04):315-337.
  • 8Diaz A,Fu M C. Models for multi-echelon repairable item inventory systems with limited repair capacity[J].European Journal of Operational Research,1997,(03):480-492.
  • 9Wong H,Cattrysse D,Oudheusden D V. Stocking decisions for repairable spare parts pooling in a multi-hub system[J].International Journal of Production Economics,2005,(08):309-317.
  • 10Jung B R,Sun B G,Kim J S. Modeling lateral transshipments in multiechelon repairable-item inventory systems with finite repair channels[J].Computers and Operations Research,2003,(09):1401-1417.

二级参考文献7

  • 1[1]谢端龙等.航材供应学[M].空军后勤学院,1993.
  • 2[2]贺步杰译.航材供应库存模型手册[M].蓝天出版社,1992.
  • 3[3]John B. Abell. Data and Data Processing Issues in the Estimation of Requirements for Aircraft Recoverable Spares and Depot Repair [R]. ADA282351,1993.
  • 4[4]E. Michael Slay, Tovey C. Bachman. Optimizing Spares Support:The Airforce Sustainability Model[ R ]. ADA320502,1996.
  • 5[5]McGlothlin, W, H. , AND R. Rander. The Use of Bayesian Techniques for Predicting Spare-Parts Demand [ R ]. The Rand Corporation,RM - 2536, 1960.
  • 6[6]Feeney,G. J. , J. W. Peterson, and C. C. Sherbrooke. A Aggregate Base Stockage Policy for Recoverable Spare Parts [ R ]. The Rand Corporation,RM- 3644R, 1963.
  • 7马绍民.综合保障工程[M]国防工业出版社,1995.

共引文献20

同被引文献28

  • 1程志君,杨征,郭波.基于PH分布近似的系统维修优化模型研究[J].系统工程学报,2010,25(1):137-144. 被引量:3
  • 2阮旻智,李庆民,李承,黄傲林.改进的分层边际算法优化备件的初始配置方案[J].兵工学报,2012,33(10):1251-1257. 被引量:21
  • 3Zhou X, Xi L, Lee J. Opportunistic preventive maintenance scheduling for a multi-unit series system based on dynamic program- ming[J]. International Journal of Production Economics, 2009, 118(2): 361-366.
  • 4Berrade M D, Cavalcante C A V, Scarf P A. Modelling imperfect inspection over a finite horizon[J]. Reliability Engineering and System Safety, 2013, 111(3): 18-29.
  • 5Wu S M, Zuo M J. Linear and nonlinear preventive maintenance models[J]. IEEE Transactions on Reliability, 2010, 59(1): 242-249.
  • 6Chun Y H. Optimal number of periodic preventive maintenance operations under warranty[J]. Reliability Engineering and System Safety, 1992, 37(3): 223-225.
  • 7Dagpunar J S, Jack N. Preventative maintenance strategy for equipment under warranty[J]. Microelectronics Reliability, 1994, 34(6): 1089-1093.
  • 8Jaturonnatee J, Murthy D N P, Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1): 201-215.
  • 9Pongpech J, Murthy D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering and System Safety, 2006, 91 (7): 772-777.
  • 10Yeh R H, Kao K C, Chang W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Com- puters and Industrial Engineering, 2009, 57(1): 304-309.

引证文献3

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部