摘要
介绍了副井井筒装备是煤矿安装工程中一项重要、复杂而又细致的工作,施工速度的快慢直接影响矿井的投产期限。而一直以来,井筒装备大临准备时间的长短又严重制约井筒装备的施工总工期,由此可以看出优化井筒装备大临设计的重要性,既要缩短大临准备时间,又要认真、细致地考虑大临设计的方方面面,保证施工安全。
Vice Shaft Construction is an important,complex and detailed coal installation works,The construction speed have a direct impact on mine production phase.All along,the time to prepare for large-scale temporary equipment Shaft Construction seriously restricted the total construction period of the Shaft Construction,It can be seen the importance of optimizing the wellbore construction of large-scale temporary equipment design,First,shorten the preparation time of large-scale temporary equipment,Second,we must seriously,and carefully consider all aspects of the design of large-scale temporary equipment and to ensure construction safety.
出处
《科技信息》
2012年第11期403-403,408,共2页
Science & Technology Information
关键词
副井井筒装备
大临准备
安装基准线
封口盘
吊盘
Auxiliary shaft equipment
Large-scale temporary equipment
Installing the baseline
Sealing plate
Hanging plate