期刊文献+

绝对累计速度CAV的标准算法及其对地震监测的影响 被引量:7

Standardized Algorithm of Cumulative Absolute Velocity and Its Effect on Seismic Monitoring
下载PDF
导出
摘要 地震危及核电站安全,可能直接触发电站停堆。在抗震设计中现有的RG规范和AP1000都引入CAV(累积绝对速度),以排除非破坏性地震的误判。介绍CAV产生的背景,阐述CAV的概念和标准化算法,以实际地震时程数据作计算算例,并结合文献资料说明CAV有助于准确判别地震对于核电站的破坏影响。 Earthquake is fatal to the nuclear power plants. It can directly lead to plant shutdown. Currently, the Cumulative Absolute Concept (CAV) has been employed in both RG code and AP1000 code for anti-seismic design in order to exclude the non-destructive earthquake. In this article, the background and concept of the CAV were introduced, and its standardized algorithm was elaborated. A computation example with the standardized CAV algorithm was provided using the time-historical data of an earthquake. The result of computation was employed to illustrate that the CAV is helpful to evaluate the destructive effect of the earthquake on the nuclear power plants.
作者 朱翊洲
出处 《噪声与振动控制》 CSCD 2012年第2期182-184,共3页 Noise and Vibration Control
关键词 振动与波 地震 CAV 标准CAV算法 地震监测 vibration and wave earthquake CAV standardized method seismic monitoring
  • 相关文献

参考文献4

  • 1李志国,潘华,李金臣,徐伟进.累积绝对速度在核电厂地震危险性分析中的应用研究[J].地震学报,2010,32(1):69-76. 被引量:7
  • 2Electric Power Research Institute. A criterion for determining exceedance of the operating basis earthquake[EPRI Report NP-5930][R].1988.
  • 3Electric Power Research Institute. Use of cumulative absolute velocity (CAV) in determining effects of small magnitude earthquakes on seismic hazard analyses[EPRI Report TR-1014099][R].2006.
  • 4Nuclear Regulatory Commission. Pre-earthquake planning and immediate nuclear power plant operator post-earthquake actions[NRC RG 1.166][R].1997.

二级参考文献9

  • 1陈培善,陈海通.由二维破裂模式导出的地震定标律[J].地震学报,1989,11(4):337-350. 被引量:21
  • 2中国地震局地球物理研究所.2005.广东阳江核电站厂址地震安全性评价报告[R].北京:中国地震局地球物理研究所:128-141.
  • 3Bolt B A. 1973. Duration of strong ground motion[C]//Proc Fifth World Conf Earth Eng: 1304-1307.
  • 4Electric Power Research Institute. 1988. A Criterion for Determining Exceedance of the Operating Basis Earthquake[R] //EPRI Report NP-5930: 1-28.
  • 5Electric Power Research Corporation. 1991. Standardization of the Cumulative Absolute Velocity[R]//EPRIReport TR- 100082: 1-20.
  • 6EPRI, Palo Alto, the US Department of Energy. 2006. Program on Technology Innovation: Use of Cumulative Absolute Velocity (CAV) in Determining Effects of Small Magnitude Earthquakes on Seismic Hazard Analyses[R]//EPRI Report TR-1014099: 1-40.
  • 7Hanks T C, Kanamori H. 1979. A moment magnitude scale[J]. J Geophys Res, 84(B5): 2348-2350.
  • 8戚承志,钱七虎.核电站抗震研究综述[J].地震工程与工程振动,2000,20(3):76-86. 被引量:28
  • 9陈培善,白彤霞.震源参数之间的定量关系[J].地震学报,1991,13(4):401-411. 被引量:62

共引文献6

同被引文献73

  • 1杨国玉.美国能源结构转换的特点[J].能源基地建设,1994(6):63-64. 被引量:3
  • 2库尔哈莱克.地震图解析[M].北京:地震出版社,1992.
  • 3核电厂地震仪表准则[S].中国核工业总公司,1993.
  • 4ZigBee Specificiation [ S ]. ZigBee Standards Organization, 2007.
  • 5Robert L N. Application of cumulative absolute velocity to real-time earthquake damage assessment[EB/OL], http://www, eqsafetysys, com/cav_ paper, htm.
  • 6Electric Power Research Institute. Prepared by Jack R. Benjamin and Associates, Inc. A Criteria for DetermingExceedance of the Operating Basis Earthquake[ R]. EPRI NP-5930, 1988.
  • 7Electric Power Research Institute. Prepared by Yankee Atomic Electric Company. Standardization of the cumulative absolute velocity[ R]. EPRI TR - 100082, 1991.
  • 8Steve K, Bob M, Liquefaction intensity measure [ R ]. Richmond, CA : Pacific Earthquake Engineering Research Center,2002.
  • 9Nuclear Regulatory Commission. Pre-earthquake planning and immediate nuclear power Plant operator postearthquake actions [ R ]. NRC RG1. 166, 1997.
  • 10Cabanas L, Benito B, Herraiz M. An approach to the measurement of the potential structural damage of earthquake ground motions[ J]. Earthquake Engineering and Structural Dynamics, 1997,26:79 - 92.

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部