摘要
越来越大的运用需求和跨越更大水深、更宽阔海峡的发展趋势,使混凝土沉管隧道的传统预制技术面临许多挑战。发展更高效率、更灵活和更可靠的预制技术具有重大意义。结合典型工程实例,阐述混凝土沉管的预制新技术:移动干坞技术,分部浮态浇注技术,工厂化、全断面节段浇注技术。分别介绍了各预制方法的技术特点、施工工艺、优势及不足。新技术的应用发展和丰富了沉管隧道的设计和施工技术。
Increasing demand and crossing deeper and wider strait make the traditional prefabrication method of concrete immersed tube face many challenges.It is of significance to develop more efficient,flexible and reliable prefabrication methods.Based on typical projects,the new methods of prefabrication of concrete immersed tube are introduced,including mobile dry dock technology,partial floating pouring technology,factory production and full-section segment pouring technology.The characteristics,construction techniques,advantages and defects for each prefabrication method are introduced respectively.The new methods enrich the design and construction technology of immersed tube tunnel.
出处
《施工技术》
CAS
北大核心
2012年第4期81-84,共4页
Construction Technology
关键词
隧道工程
沉管
预制
移动干坞
浮态浇注
全断面浇注
tunnels
immersed tube
prefabricated
mobile dry dock
floating pouring
full-section pouring