头屯河水库除险加固工程施工导截流设计 被引量:6

Design of Construction Diversion and River Closure in Toutun River Reservoir Reinforcement Project
下载PDF
导出
摘要 通过分析研究头屯河水库坝址区气象、水文和地形、地质条件,对施工导、截流进行方案设计。重点研究导流标准、导流方式和截流时段、截流标准及截流方式,实践证明,本次导截流设计的实施,降低了施工难度,实现了头屯河水库除险加固导截流目标,保证了后续工程的施工。 Through the analysis of Toutun River reservoir dam area meteorological, hydrological and topography, geological conditions, designing the construction programme of diversion and closure. Focus on the diversion standard, diversion means and closure time, closure standard and the closure means, the practice has proved the river diversion and closure design implementation reduced the difficulty of construction, implementing the target of river diversion and elosuer in Toutun River reservoir reinforcement and ensuring the follow-up project construction.
作者 马军
出处 《水科学与工程技术》 2012年第1期21-22,共2页 Water Sciences and Engineering Technology
关键词 头屯河 导截流 标准 方式 设计 Toutun River reservoir diversion and river closure standard mode design
  • 相关文献

同被引文献24

  • 1赵廷式,韩龙.关于大坝施工导流方式及围堰洪水标准问题[J].山西水利科技,2007(1):1-3. 被引量:5
  • 2黄合义,姜言亮,龚晶,栾荣章.浅析水利工程施工组织设计优化[J].水利规划与设计,2007(4):47-48. 被引量:30
  • 3SL223-2008,水利水电建设工程验收规程[S].
  • 4DL/T5148-2001.水工建筑物水泥灌浆施工技术规范[S].[S].,..
  • 5SL31-2003.水利水电工程钻孔压水试验规程[S].[S].,..
  • 6SL264-2001.水利水电工程岩石试验规程[S].[S].,..
  • 7DLT5144-2001.水工混凝土施工规范[S].[S].,..
  • 8SL/T231-98,聚乙烯(PE)土工膜防渗工程技术规范[S].
  • 9DL/T 5169-2002,水工混凝土钢筋施工规范[S].
  • 10SL 303-2004,水利水电工程施工组织设计规范[S].

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部