摘要
对天津滨海地区新建供热锅炉房采用真空预压加固软土地基工程进行了分析。采用真空预压加固软土地基以及锅炉房地基二次处理,可满足锅炉房对地基承载力的要求。
The vacuum preloading consolidation project of soft foundation of a new heating boiler room in Tianjin Binhai New Area is analyzed. The vacuum preloading consolidation of soft foundation and the secondary treatment of boiler room foundation can meet the requirement of bearing capacity of boiler room foundation.
出处
《煤气与热力》
2012年第4期5-7,15,共4页
Gas & Heat
关键词
锅炉房
真空预压加固
软土地基
承载力
boiler room
vacuum preloading consolidation
soft foundation
bearing capacity