摘要
橡胶坝工程位于阿什河干流上,位于右岸桩号6+200位置处,是防洪结合拦河蓄水,以形成雍水水面,达到改善河流的自然景观的目的,属美化城市景观的水利工程。设计中要满足50 a一遇洪水宣泄要求,还要防止泥沙卷入坝袋底部增加磨损,有利于管理。
The rubber dam project is situated on the main stream of the Ashen River,at the pile No.6+200 of the right bank,and it is to form a backwater surface by combing flood control with water storage by blocking the river to realize improving the natural landscape of the river.The project is a hydraulic project beautifying urban landscape.In the design,the demand for 50-year flood needs to be met,and also need to prevent sediment flowing into the bottom of dam bags so as to make it easy for us manage the project.
出处
《黑龙江水利科技》
2012年第1期101-103,共3页
Heilongjiang Hydraulic Science and Technology
关键词
橡胶坝
总体布置
充水式坝袋
锚固
水泵选型
rubber dam
general layout
type of water filling
dam bag
anchoring
pump type selection