白洋淀特殊的自然地形及防洪调度的重要性决定了枣林庄闸前除堼及淀内开卡的必要性,文章讲述了历次开卡的背景及标准,通过1996年实测数据佐证了工程效果。
The special natural topography and the importance of flood control management in Baiyangdian decide the nececity for Zaolinzhuang to remove flood blocking and open the checkpost before the gate.The article describes backgrounds and standard of opening the checkpost in all pevions times,and proves the project effect based on data observed in 1996.