宁夏南部山区水库坝前淤泥面加坝技术分析 被引量:2

On ppstream sedimentary heightening fill for the reservoirs of south mountain area in Ningxia
下载PDF
导出
摘要 土坝坝前淤泥面加坝方法已成为宁夏南部山区水库除险加固的主要技术措施.以雅石沟水库除险加固工程为例,针对采用坝前淤泥面加坝方法存在的问题进行了分析,提出应对措施,以期对黄土丘陵山区水库除险加固工程有借鉴作用. The method upstream sedimentary heightening fill on the earth dam has become a main technical measure for the reservoirs' danger removal and reinforcement for south mountain area in Ningxia. The project of design ,construction, the later deformation monitoring of the dam are introduced in this paper. Just for some existing problems, some countermeasures are put forwarded, which is hoped to be reference for the loess hilly reservoir in the project of danger removal and reinforcement.
出处 《农业科学研究》 2012年第1期61-64,共4页 Journal of Agricultural Sciences
基金 宁夏回族自治区水利厅规划计划处和建设与教育处2008年重点科研项目
关键词 土坝 除险加固 上游淤积面加坝 黄土 宁南山区 earth dam south mountain area in danger removal and reinforcement upstream sedimentary heightening fill loess Ningxia
  • 相关文献

参考文献10

二级参考文献21

共引文献68

同被引文献18

  • 1姜弘,沈水龙,钭逢光,蔡丰锡,许烨霜.塑料排水板处理的软土地基的分析[J].岩土力学,2004,25(z2):437-440. 被引量:35
  • 2张甲峰,钱建固,张合青,韩黎明,曹杰,李军世.塑料排水板联合超载预压处理超大面积深厚软基的数值分析[J].岩土工程学报,2013,35(S2):892-896. 被引量:19
  • 3王萍,夏仲平.病险水库除险加固中的主要技术措施[J].人民长江,2006,37(8):87-88. 被引量:37
  • 4中华人民共和国建设部.JGJ79-2002建筑地基处理技术规范[S].北京:中国建筑工业出版社,2003.
  • 5中华人民共和国水利部.SL274-2001碾压式土石坝设计规范[S].北京:中国水利水电出版社,2002.
  • 6刘艳.基于ANSYS的土坝加高应力变形有限元分析[D].杨凌:西北农林科技大学,2010.
  • 7宁夏水利新志编篡委员会,宁夏水利新志[M],银川:宁夏人民出版社,2004.
  • 8侯震望,徐鸿江,闫中华.巴家嘴水库在坝前淤土上加高土坝的试验与设计施工[J].人民黄河,1981,3(3):12-18.
  • 9固原市水利勘测设计院.雅石沟水库除险加固设计初步设计报告[R].固原:固原市水利勘测设计院,2008.
  • 10CHAI J C, MIURA N. Investigation of Factors Affecting Vertical Drain Behavior [ J ]. Journal of Geotechnical and Geoenvironmental Engineering, 1999 (3) : 216 - 226.

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部