市政道路工程前期阶段快速组价方法与动态调整 被引量:1

Rapid Price Method and Dynamic Adjustment of Municipal Road Engineering Early Stage
下载PDF
导出
摘要 如何在工程前期阶段利用估算指标或调整后的估算指标快速、准确地测算出申报立项工程的工程投资,是决策者、投资者、设计者关注的重要问题。此文探讨根据行业规程、规范和市政建设工程概预算定额,建立市政道路结构层估算指标测算标准库,利用估算结构层指标标准库进行快速组价的方法及适用范围。通过某工程立项阶段的投资估算与初步设计、施工图设计阶段编制的概预算进行对比,验证该方法具有合理性和准确性。 In the early stages of project, how to use estimate index or adjusted estimation index quickly and accu rately to declare the engineering project investment is the decision makers, investors, and designers'in terested problem. This article discusses to use the industry standard and procedures and the municipal construction engineering project budget norm to build municipal road structure layer estimate index calcu- lation standard library. The budget compare in an engineering project investment estimation ( estimate index) and preliminary design and construction drawing design phase show that the method is reasonable and accurate.
作者 彭寿长
出处 《铁路工程造价管理》 2012年第2期37-40,43,共5页 Railway Engineering Cost Management
关键词 市政道路 工程前期 组价方法 动态调整 municipal road project early stage price method dynamic adjustment
  • 相关文献

参考文献3

二级参考文献3

共引文献8

同被引文献1

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部