近年来盾构法隧道施工逐渐成为城市地下铁道施工的主流方法,其特有的施工安全管理问题也引起了广泛关注。文章结合深圳地铁二期工程2号线2222标侨香站—香蜜站—香梅北站两区间的施工实践,对土压平衡式盾构法隧道施工的安全生产进行了研究,并提出了对城市地铁及地下工程施工的安全控制措施。
Shield technology has recently been the main construction method for urban underground railways,and its construction safety management issues have attracted much attention.This paper studies the construction safety of earth-pressure balance shields using the construction of the section between the Qiaoxiang,Xiangmi,and North Xiangmei Stations of the Shenzhen Metro line 2 as an example.Additionally it puts forward safety control measures for the construction of urban subways and underground works.
出处
《现代隧道技术》
EI
北大核心
2012年第2期15-20,共6页
Modern Tunnelling Technology
关键词
盾构法
隧道施工
安全控制
Shield method
Tunnel construction
Safety control