上软下硬地层盾构施工技术研究 被引量:66

Study of Shield Construction Technology in Soft Upper Stratum and Hard Under Stratum
下载PDF
导出
摘要 依托深圳地铁2号线东延线土建2222标侨香站—香蜜站盾构区间,分析了在上软下硬地层中盾构法施工存在进度缓慢、刀具磨损严重、喷涌等难点和风险。为提高上软下硬地层盾构施工的掘进效率,文章给出了具体的盾构掘进参数;针对上软下硬地层盾构施工易发生结泥饼和喷涌等问题,从其发生机理出发,研究了相应碴土改良技术;针对上软下硬地层周边环境复杂、开舱作业风险高的问题,研究了带压开舱换刀技术。 Based on the construction of the shield tunnel from the Qiaoxiang Station to the Xiangmi Station of Lot 2222 of the Shenzhen Metro line 2,this paper analyzes the difficulties and risks of slow progress,serious cutter wearing,and blow-out in the soft upper stratum and hard under stratum.Concrete parameters of shield driving are given.In light of the mechanism of mud cake and blow-out occurring,the techniques of soil improvement were studied.Furthermore this paper addresses cutter change techniques in a pressurized chamber.
作者 邓彬 顾小芳
出处 《现代隧道技术》 EI 北大核心 2012年第2期59-64,共6页 Modern Tunnelling Technology
关键词 上软下硬地层 盾构施工 碴土改良 带压开舱 Soft upper stratum and hard under stratum Shield construction Soil improvement Operation in pressurized chamber
  • 相关文献

参考文献2

二级参考文献2

  • 1[3]Maidl U.Geotechnical and mechanical interactions using the earth-pressure balanced shield technology in difficult mixed face and hard rock conditions[A].In:Proceedings of Rapid Excavation and Tunneling Conference[C].[s.l.]:[s.n.],2003.483-493.
  • 2[4]Clough G W.EPB shield tunneling in mixed face conditions[J].Journal of Geotechnical Engineering,1993,119:1 640-1 656.

共引文献77

同被引文献400

引证文献66

二级引证文献483

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部