3PTV Planung Transport Verkehr AG. VISSIM User Manual-Version3.70[R]. PTV Corporation, 2003.
4HURLEY J W. Utilization of auxiliary through lanes atsignalized intersections with downstream lane reductions [ J ]. Transportation Research Record: Journal of the Transportation Research Board, 1996,1572: 167-173.
5BUGG Z, ROUPHAIL N, SCHROEDER B, et al. Implementing auxiliary thmugh lanes in context of highway capacity analysis [ J ]. Transportation Research Record: Journal of the Transportation Research Board, 2012, 2286, 21-28.
6TARAWNEH M S. Utilization of auxiliary through lanes at intersections of four-lane, two-way roadways [ J ]. Transportation Research Record : Journal of the Transportation Research Board, 2000, 1737 : 26-33.
7TARAWNEH M S, TARAWNEH T M. Effect on utilization of auxiliary through lanes of downstream right- turn volume [ J ]. Journal of Transportation Engineering, 2002, 128(5) : 458-464.
8BUGG Z, ROUPHAIL N, SCHROEDER B. Lane choice model for signalized intersections with an auxiliary through lane [ J ]. Journal of Transportation Engineering, 2013, 139(4): 154-186.
9YOICHI M, MASAHIKO M, SHOICHI H, et al. The effect on lane utilization and traffic capacity of adding an auxiliary lane original research [ J ]. Social and Behavioral Sciences, 2011, 16: 37-47.
10MOON J P, REESE P E, MICHAEL P. Evaluation of operations and safety in a congested freeway merging area with auxiliary through lane [ C]//Transportation Research Board 91st Annual Meeting. Washington DC: Transportation Research Board, 2012.