摘要
钢铁厂炼铁工程洗净塔是属于综合管网的单体建筑,洗净塔的结构主体由塔体及支架两部分组成。对洗净塔在结构分析及设计中荷载的取值、壳体应力分析、支架布置等几个问题进行探讨,其结论可供类似工程参考。
The gas cleaning tower of iron-making project in iron and steel plant belongs to the pipe network system.The gas cleaning tower is composed by tower and support structure.Discussed the problems of the load value,shell stress analysis and support arrangement in the analysis and design of the gas cleaning tower.The conclusion can be referenced by similar engineering.
出处
《工程建设与设计》
2012年第4期76-77,80,共3页
Construction & Design for Engineering
关键词
洗净塔
壳体
支架
cleaning tower
shell
support frame