摘要
文章以20世纪50年代中期皖西北地区的打井运动为中心,呈现了建国初农田水利建设中的政治化倾向。通过对打井兴起过程以及打井技术与经济条件制约的分析,揭示了打井走向政治运动化的过程。水井的高报废率虽遭致基层对打井的质疑,但走上政治运动的打井并未在抱怨声中适可而止。在不断政治化的推进中,水井的高报废率也最终消解了这场农田水利建设运动的原本意义。
The paper described the politicalization of farming water conservancy projects at the dawn of the Republic,highlighting the well-sinking drive in the Northwestern Anhui Province.The process of politicalization was represented through the analysis on the proposal,decision,technology use and economic restriction of the drive.The political-movement-oriented digging fever was not brought down by the grass-root units′ doubts and complaint provoked especially by the high spoilage.The accelerating politicalization and rate of rejection had finally nullified the original significance of the water conservancy project.
出处
《南京农业大学学报(社会科学版)》
CSSCI
北大核心
2012年第2期89-95,共7页
Journal of Nanjing Agricultural University(Social Sciences Edition)
基金
华东师范大学"博士研究生学术新人奖"基金项目(XRZZ2010011)
关键词
皖西北地区
打井
农田水利建设
政治运动
Northwestern Anhui Province
Well-sinking
Irrigation Proiect Construction
Political Movement