摘要
以平朔东露天煤矿剥离工程为例,详细阐述了露天矿基建剥离工程施工阶段造价控制应注意的要点,并提出了具体措施,为此类项目的投资控制和管理提供了很好的参考。
In this paper, it is discussed in detail what important points should be considered about cost control of construction stage in stripping engineering of surface coal mine and some specific measurements are given for good reference of control of investment and management of this kind of project.
出处
《露天采矿技术》
CAS
2012年第2期88-90,共3页
Opencast Mining Technology
关键词
造价控制
施工阶段
基建剥离
露天煤矿
cost control
construction stage
stripping engineering
surface coal mine