摘要
建设项目工程实施阶段是实际发生资金支付的主要阶段,是建设项目投资管理和控制的关键时期。采取有效措施加强对工程变更、工程索赔、工程价款结算、资金使用和工程竣工结算等环节的工程造价管理,管好用好资金,将建设项目工程总造价控制在审定的设计总概算之内,对建设项目总体目标的实现具有至关重要的意义。
The implementation phase of construction project is main fund disbursement period and is also the critical phase of investment management and control. Taking effective measures to strengthen cost management in contract change, claim and senlement, fund application and project completion settlement, and controlling the total costs not more than the total design budget, are very important for achieving the overall objectives of construction project.
出处
《水力发电》
北大核心
2012年第5期13-15,20,共4页
Water Power
关键词
建设项目
实施阶段
造价管理
控制目标
蒲石河抽水蓄能电站
construction project
implementation phase
cost management
control objective
Pushihe Pumped-storage Power Station