期刊文献+

预应力混凝土板桩在天津中心渔港的应用 被引量:1

Application of Prestressed Concrete Sheet-pile in Tianjin Central Fishing Port
下载PDF
导出
摘要 中心渔港东隔埝工程远期规划为游艇码头,故需采用直立结构。通过反复比选,隔埝采用预应力板桩结构,锚碇结构采用锚碇叉桩。由于预应力板桩结构较为敏感,文章详细介绍了在软土地基不利情况下的结构优化设计。通过本项目,拓展了板桩结构使用前景,获得了显著的经济收益。 A vertical structure was adopted for the east cofferdam for Tianjin central fishing port as the east cofferdam has been planned for a yacht marina for the long term development.Prestressed sheet-piles were selected for the cofferdam construction after repeated comparison and anchoring braced pile was used in anchoring structure.As a prestressed sheet-pile structure is rather sensitive,this paper has in detail illustrated structural optimization design under the adverse conditions of soft earth foundation.The prospect of sheet-pile structure application has been expanded and striking economic gain has been achieved by the execution of this project.
出处 《中国港湾建设》 2012年第2期35-39,共5页 China Harbour Engineering
关键词 预应力板桩 锚碇叉桩 优化 prestressed sheet-pile; anchored brace pile; optimization
  • 相关文献

参考文献1

  • 1JTS 167-3-2009板桩码头设计与施工规范[S].

共引文献27

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部