井筒变形预测与保护措施研究 被引量:3

Study on Shaft Deformation Forecast and the Protective Measures
下载PDF
导出
摘要 针对鹤壁二矿井筒与工业广场保护煤柱的开采,确定了采用膏体充填分层下行式开采的方法,并计算出了允许的地表最大下沉系数为0.15。在此开采方法下,进行了井筒变形的预测,得出随着工作面向井筒推进,井筒下沉和拉伸变形也相应变大,当工作面推过井筒50 m时,井筒变形达到稳定;并根据预测结果进行了保护措施的选择。 In this paper,aiming at the mining of the portal and industrial area pillars,the author decided to adopt the paste backfilling with slicing descending mining method and figured out that the allowable subsiding ratio is 0.15.Based on this mining method,the portal deformation prediction was conducted.As a consequence,the conclusion was that the portal would subside and the stretching deformation could become greater with the working face advancing towards the portal.What's more,the portal deformation would become stable when the working face was approximately 50m in the front of the portal.Addition to that,protecting measures were chosen on the basis of the predicting results.
出处 《金属矿山》 CAS 北大核心 2012年第4期141-143,共3页 Metal Mine
关键词 膏体充填 井筒变形 变形预测 井筒保护 Paste backfill mining Portal deformation Deforming prediction Portal protecting
  • 相关文献

参考文献4

二级参考文献9

共引文献259

同被引文献22

引证文献3

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部