期刊文献+

基于知识进化粒子群算法的模糊交货期流水车间调度问题 被引量:6

Knowledge evolution particle swarm optimization for solving flow shop scheduling problem with fuzzy due date
下载PDF
导出
摘要 针对模糊交货期的流水车间调度问题的特点,提出采用知识进化算法和粒子群优化的混合算法来求解问题。该算法首先在多个群体空间内采用粒子群优化寻找局部最优解,然后利用知识进化算法的猜测操作和反驳操作建立以群体空间知识为基础的一个知识空间,最后通过知识空间的协同进化更新其中的社会知识,从而形成问题的最优解。通过采用所提算法对带模糊交货期的流水车间调度问题的实例进行测试,并比对遗传算法和粒子群优化算法,表明了混合算法的可行性和有效性。 Aiming at the characteristics of flow shop scheduling problem with fuzzy delivery time,the hybrid algorithm based on knowledge evolution algorithm and particle swarm optimization was proposed to solve the problem.Particle swarm optimization was used by the algorithm to find a local solution in multi-group space,and the surmise operation and the forecast operation as well as rebut operation of knowledge evolution algorithm were used to built a knowledge space based on group space knowledge.The social knowledge in knowledge space was updated by coevolution,thus the optimum solution of the problem was formed.The example of flow shop scheduling problem with fuzzy delivery time was tested by proposed algorithm,and the result showed the feasibility and effectiveness of the hybrid algorithm.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2012年第4期807-812,共6页 Computer Integrated Manufacturing Systems
基金 高等学校博士点基金资助项目(20093120110008) 上海市重点学科建设资助项目(S30504)~~
关键词 流水车间调度 知识进化算法 粒子群优化 模糊交货期 flow shop scheduling knowledge evolution algorithm particle swarm optimization fuzzy due date
  • 相关文献

参考文献15

  • 1MCCAHON C S,LEE E S. Fuzzy iob sequencing for a flow shop[J].European Journal of Operational Research,1992,(03):294-301.
  • 2TEMIZ I.EROL S. Fuzzy branch-and-bound algorithm for flow shop seheduling[J].Journalof Intelligent Manufactur ing,2004,(04):449-454.
  • 3ISHIBUCHI H,YAMAMOTO N,MURATA T. Ge netic algorithms and neighborhood search algorithms for fuzzy flow shop scheduling problems[J].Fuzzy Sets and Systems,1994,(01):81-100.
  • 4LAI P J,WU H C. Using ant colony optimization to minimize the fuzzy makespan and total weighted fuzzy completion time in flow shop scheduling problems[J].International Journal of Uncertainty Fuzziness and Knowledge-Based Systems,2009,(04):559-584.doi:10.1142/S0218488509006145.
  • 5KIRAN KUMAR M S N,BISWAL B B,MAHAPATRA S S. Optimization of flowshop scheduling with fuzzy due dates using a hybrid evolutionary algorithm[EB/OL].http://dspace,nitrk,ac.in/dspaee/bits-tream/2080/691 / 11BBB-2007-coim conf.pdf,2010.
  • 6王莉,杜广宇,刘洪,张庆灵.带有交货期窗口模糊加工时间的Flow-shop调度问题[J].系统工程理论方法应用,2005,14(6):532-536. 被引量:3
  • 7沈兵虎,柳毅,潘瑞芳.改进微粒群算法求解模糊交货期Flow-shop调度问题[J].计算机工程与应用,2006,42(34):36-38. 被引量:5
  • 8方述诚;汪定伟.模糊数学与模糊优化[M]北京:科学出版社,199734-68.
  • 9KENNED Y J,EBERHART R C. Particle swarm optimiza tion[A].Piscataway,N.J,USA:IEEE Press,1995.1942-1948.
  • 10卢冰原,古春生,谷峰.基于粒子群优化的模糊交货期惩罚问题的研究[J].计算机工程与应用,2006,42(19):8-10. 被引量:1

二级参考文献54

共引文献28

同被引文献69

引证文献6

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部