摘要
结合柬埔寨王国额勒赛下游水电站上、下电站施工建造的要求,介绍了额勒赛下游水电站施工控制网的设计方法和要求,对控制网GPS外业观测成果的质量进行了简要的分析,详细讨论了GPS控制网内、外业数据处理的方法和要求。
Combined with the Kingdom of Kampuchea in Lower Stung Russei Chrum Hydropower Project-Upper station,Lower Station construction requirements,this paper introduces construction control network design methods and requirements the of Lower Stung Russei Chrum Hydropower Station,briefly analyzes the control network of GPS field observation result quality,discusses the GPS control network,internal-field data processing methods and requirements.