期刊文献+

两个相依部件并联系统的几何过程模型 被引量:2

A geometric process model for parallel system with two dependent components
下载PDF
导出
摘要 研究了由两个不同相依部件和一个修理工组成的可修型并联系统。假设两个部件的工作寿命服从二维指数分布及修理时间服从指数分布,对部件1的修理是几何修理而对部件2则修复如新。运用几何过程理论和补充变量方法,得出了系统的可靠度和系统首次故障前平均时间的拉普拉斯表达式。最后,通过数值例子验证了结果的有效性。 The repairable parallel systems of two dependent components and a repairman are studied.Assume that two components of the working life of obedience two-dimensional exponential distribution and the repair time is exponentially distributed,and the repair of the component 1 is the geometry and the repair of the component 2 is as good as new.By using the geometric theory and the supplementary variable method,some important reliability indices are obtained such as system availability and the Laplace expression of average working time to first failure.Finally,a numerical simulation is used to verify the effective of the results.
机构地区 燕山大学理学院
出处 《黑龙江大学自然科学学报》 CAS 北大核心 2012年第2期169-173,共5页 Journal of Natural Science of Heilongjiang University
基金 全国统计科学研究计划项目(2010LC33) 河北省教育厅科研计划项目(2007323)
关键词 几何过程 补充变量 马尔可夫过程 拉普拉斯变换 geometric process supplementary variable Markov process Laplace transform
  • 相关文献

参考文献7

二级参考文献37

  • 1王冠军,张元林.有优先维修权和优先使用权的冷储备系统的几何过程模型[J].经济数学,2005,22(1):42-49. 被引量:22
  • 2吴少敏,张元林.修理情形不同的两部件串联系统的可靠性分析[J].应用数学,1995,8(1):123-125. 被引量:18
  • 3史定华.计算可修系统在(0,t)中平均故障次数的新方法[J].应用数学学报,1985,(1):100-110.
  • 4Zhang Y L. A geometric-process repair-model with good-as-new preventive repair [J]. IEEE Trans Reliability, 2002 ,R-51 (2) : 223- 228.
  • 5Lam Y, Zhang Y L. A geometric-process maintenance model for a deteriorating system under a random environment [J]. IEEE Trans. Reliability, 2003 ,R-52 (1) : 83- 89.
  • 6Lam Y. Gemetric processes and replacement problem [J]. Acta Mathematicae Applicate Sinica, 1988, (4) : 366-377.
  • 7Stanley A D J. On gemetric process and repair replacement problems [ J ]. Microelectronie and Reliablity, 1993, (33) :489-491.
  • 8Zhang Y L. A geometric-process repair-model with good-as-newpreventive repair[J]. IEEE Trans.Reliability,2002,51 (2):223-228.
  • 9Lain Y, Zhang Y L. A geometric-process maintenance model for adeteriorating system uneder a random environmengt[J]. IEEE Trans.Reliability,2003,52( 1 ):83-89.
  • 10Lam Y. Gemetric processes and replacement problem[J]. AetaMathematicae Applicate Sinica, 1988,(4):366-377.

共引文献44

同被引文献18

  • 1梁小林,莫兰英,唐小伟.具有修理工休假的冷备退化可修系统的研究[J].系统工程学报,2010,25(3):426-432. 被引量:4
  • 2孟娅丽,郑海鹰.修理工可多重休假的温贮备系统[J].浙江大学学报(理学版),2012,39(5):517-523. 被引量:5
  • 3岳德权,朱建玲,秦雅玲,李春艳.修理工可多重休假的带有一个冷贮备部件的Gaver并联系统[J].系统工程理论与实践,2006,26(6):59-68. 被引量:17
  • 4YUAN Li, MENG Xian-yun. Reliability analysis of a warm standby repairable system with priority in use [ J ]. Applied Mathematical Modelling, 2011, 35(9) : 4295 -4303.
  • 5ZHANG Yuan-lin. A geometric-process repair-model with good-as-new preventive repair [ J ]. IEEE Transactions on Reliability, 2002, 51 ( 2 ) : 223 - 228.
  • 6LAM Y, ZHANG Yuan-lin. A geometric-process maintenance model for a deteriorating system under a random environment [ J ]. IEEE Transac- tions on Reliability, 2003, 52 ( 1 ) : 83 - 89.
  • 7Chen Yutian, Meng Xianyun, Chen Shengqiang. Reliability analysis of a cold standby system with imperfect repair and under Poisson shocks [ J ]. Mathematical Problems in Engineering,2014,4 : l - 11.
  • 8Yu Haiyang,Yalaoui F, Chatelet E, et al. Optimal design of a maintainable cold-standby system [ J ]. Reliability Engineering and System Safety,2007,92( 1 ) : 85 - 91.
  • 9Wen Zhiyuan, Gen Qixu. Modelling of a deteriorating system with repair satisfying general distribution [ J ]. Applied Mathematics and Computation, 2012, 218 (11 ): 6340- 6350.
  • 10唐应辉,刘艳.修理工单重休假且不能修复如新的冷储备可修系统[J].数学的实践与认识,2008,38(2):47-52. 被引量:10

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部