期刊文献+

湖北电网规划原则的探索 被引量:5

Exploration of Planning Principles of Hubei Grids
下载PDF
导出
摘要 文章介绍了2008年冰灾及汶川地震后国家对提高电力系统抗灾能力的新规定,以及2011年国务院《电力安全事故应急处置和调查处理条例》对电网运行的新要求;对湖北电网规划目标和原则进行补充探索,提出目标电网安全性扫描方法,为今后的电网滚动规划提供依据。 The paper introduces the new demands for the improvement of the anti-disaster ability of power system after the ice damage in south China and Wenchuan earthquake in 2008, and the new reg- ulations of production safety accident reporting and investigation regulations. The author discusses the goal and principle of the Hubei grids and proposes a new security scanning method for the objective grid in detail, in order to provide foundations for the future development layout of Hubei grids.
作者 施通勤
机构地区 湖北省电力公司
出处 《湖北电力》 2012年第2期7-9,共3页 Hubei Electric Power
关键词 抗灾能力 电力安全 规划原则 安全性扫描 anti-disaster ability electricity safety planning principle security scanning
  • 相关文献

同被引文献54

  • 1DL/T5429-2009,电力系统设计技术规程[s].
  • 2Wenyuan Li. Probabilistic transmission system planning[M]. New Jersey: John Wiley & Sons, 2011: 92-93.
  • 3英国ERP2/6供电安全标准及其应用专项培训材料[R].南京:江苏省电力公司,2012.
  • 4国家电力调度通信中心,.《电力系统安全稳定导则》学习与辅[M].北京:中国电力出版社,2001:52-57.
  • 5DL755-200l电力系统安全稳定导则[S].
  • 6国家电网公司.Q/GDWl56-2006城市电力网规划设计导则[S].北京:中国电力出版社,2006.
  • 7中国南方电网公司.中国南方电网公司220干伏及以上规划技术原则[S].2009.
  • 8广东电网公司.广东电网规划设计技术原则[S].2010.
  • 9上海市电力公司.上海电网若干技术原则的规定[S].4版.2011.
  • 10North American Electric Reliability Corporation. Reliability standards for the bulk electric system's of North America[S]. 2010.

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部