摘要
小浪底工程施工过程中 ,在业主、环境监理工程师和承包商的共同努力下 ,承包商对施工过程中产生的废水、废气、噪声和固体废弃物采取了一系列防治措施 ,有效地控制了施工活动产生的环境污染 ,为水利水电工程施工期环境保护工作提供了值得借鉴的经验。
Under the combination efforts of the owner, the contractor and environment supervision engineers, the contractor have adopted a series of prevention measures to deal with sewage, waste air, noise and waste solid created in Xiaolangdi project implementation, which effectively controlled pollution in project activities, and provide valuable experience for environment protection in implementation period of hydropower projects. Key words:implementation period; environment pollution control; Xiaolangdi project
出处
《人民黄河》
北大核心
2000年第3期30-31,共2页
Yellow River