摘要
通过对两种预报方案原理的分析 ,建立、检验模型 ,并深入探讨了序列周期外推的合理性 .
Through analyzing the principles of two runoff forecasting methods, the models for forecasting runoff are built and tested, the reasonability of extending the period sequence is deeply discussed. The result indicates that the period analysis method is more suitable for Wuxijiang Reservoir′s long period runoff forecasting.
出处
《武汉水利电力大学学报》
CSCD
2000年第1期59-62,共4页
Engineering Journal of Wuhan University
关键词
径流
长期预报
逐步回归
周期分析
runoff
long period forecasting
stepwise regression
period analysis