缅甸古浪水电站在充分考虑工程区地形地质、水文条件、施工及经济投资等因素,通过对坝址、引水线路、厂址、坝型的比较选择,实现枢纽布置的合理性及经济性。
Under full consideration of topographic-geological,hydrological and construction conditions of project area and economic investment etc.,Gawlan hydropower station obtains a rational and economic general layout through comparison and selection of damsite,diversion route,plant site and dam type.
出处
《红水河》
2012年第2期17-19,共3页
Hongshui River
关键词
枢纽布置
方案
选择
缅甸古浪水电站
general layout
scheme
selection
Gawlan hydropower station in Myanmar