摘要
介绍了建筑混凝土剪力墙内电气箱体底壳安装工艺方法,施工工艺流程及操作要点,通过严格控制配电箱体标高和几何尺寸,配电箱体与剪力墙体钢筋一起固定,和混凝土一起浇筑,达到了设计和规范标准,收到良好的效果。
The paper introduces the installation methods,the procedure for the construction craft and operation points for the bottom shell of the electric box at architectural concrete shearing walls,and indicates the distribution box is fixed with the reinforcement of shearing wall and grouted with the concrete by strictly controlling the elevation of the distribution box and its geometry size,so it achieves the standards for the design and regulation and better effect.
出处
《山西建筑》
2012年第15期95-96,共2页
Shanxi Architecture
关键词
建筑剪力墙
直埋
配电箱体
安装工艺
architectural shearing wall
directly-buried
distribution box
installation craft