摘要
介绍了强夯及振冲两种施工工艺在沙特扎瓦尔港码头堆场吹填区地基加固的处理效果及适用性,并对两种工艺从不同工程目的、经济适用性。
Soil improvement was needed for the Ras Az Zawr port in Saudi Arabia. Authors introduced two methods in the paper, including dynamic compaction and vibrating blunt. Improvement effects, applicability, purposes, cost were also compared and concluded.
出处
《土工基础》
2012年第2期7-9,共3页
Soil Engineering and Foundation
关键词
地基加固
强夯
振冲
Soil Improvement, Dynamic Compaction, Vibrating Blunt