摘要 通过对武汉市轨道交通3号线盾构隧道下穿2号线既有隧道工程实例的分析,结合类似地层工程经验提出了盾构隧道近距离下穿既有隧道的工程措施,并运用数值分析的方法,得到了盾构下穿过程中既有隧道的竖向位移与盾构机顶推力、土层加固、盾构机掘进位置的关系,验证了工程措施的可行性,提出了相关建议。 Engineering measures for existing tunnel under crossed by shield tunnel in short distance were put forward through the analysis of project example in the Wuhan Metro line 2 under crossed by Metro line 3, combined with the engineering experience of similar geological strata. Numerical analysis methods were used to obtain the relations between the vertical displacement of existing tunnel and the jacking force of shield machine, ground strengthening and position of the shield machine. Feasibility of the engineering measures was verified and related suggestions were put forward.
出处 《土工基础》 2012年第2期13-15,共3页 Soil Engineering and Foundation
关键词 盾构 近距离下穿 既有隧道 数值分析 Shielding, Under Crossing in Short Distance, Existing Tunnel, Numerical Analysis
  • 相关文献

参考文献5

二级参考文献32

共引文献303

同被引文献46

引证文献10

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部