摘要
结合某地铁车站地下连续墙施工中钢筋笼的成功吊装经验,介绍了吊装机械的选择、起吊能力验算、吊点位置的确定及吊装作业程序等,可供同类工程借鉴。
The construction method for lifting rebar cage for diaphragm wall for a metro station is presented in as case study. The selection of crane, lifting capacity estimation, the locations of pick points and proper construction procedure are presented in this paper.