摘要 大庆石化公司炼油厂第二污水处理装置原设计处理量为600t/h,2008年3-5月装置进行检修、改造和扩建,增加自动控制系统及工艺参数在线分析检测仪。处理量提升至800t/h,炼油污水全部进入第二污水处理装置进行处理,处理结果表明污水净化处理效果理想。 The original treatment capacity of the No.2 wastewater Treatment Plant of Daqing Petrochemical Company Oil Refinery was 600 t/h.In Mar.-May of 2008,the process design modification,equipment overhaul,renovation and expansion were made to the Plant,and automatic control system and process parameters'online analytical detector were added,the design capacity was increased to 800 t/h,the Refinery wastewater was totally sent into the No.2 Wastewater Plant for treatment,and the application result showed that the wastewater purification treatment effect is ideal.
作者 林峰
出处 《炼油与化工》 2012年第2期21-23,58,共3页 Refining And Chemical Industry
关键词 污水处理 技术改造 格栅 A/O生化工艺 wastewater treatment technical renovation grid A/O biochemical process
  • 相关文献

参考文献3

  • 1纪轩.废水处理问答[M].北京:中国石化出版社,2005:11-14.
  • 2李本高.工业水处理技术(第2版)[M].北京:中国石化出版社,2004:42-43.
  • 3纪轩.废水处理工必读[M].北京:中国石化出版社,2004:18-20.

共引文献2

同被引文献15

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部