期刊文献+

复合垂直流人工湿地系统中污染物磷的去除规律研究 被引量:2

Research on Phosphorous Removal in Integrated Vetical Flow Constructed Wetland
下载PDF
导出
摘要 本文采用复合垂直流人工湿地进行了生活污水中磷的去除效果试验研究。试验结果表明,在水力负荷为222 mm/d的条件下,总磷的去除率可高达80%以上,而且去除效果随水力负荷的降低而增加,总磷的去除主要发生在下行流池中,而在上行流池中存在磷的释放现象;温度和溶解氧对磷的去除效果影响不显著。 The integrated vetical flow constructed wetland was applied to study the phosphorous removal from sewage.The results showed that in the condition of 222 mm/d,the total phosphorous removal efficiency is 80%,and the removal efficiceny increases with the decrease of hydraulic loading.In the wetland system,the removal of phosphorous mainly occurred in the down flow wetland,and the phosphorous released from the up flow wetland.The influence of temperature and dissovled oxygen to the phosphorous removal is not obvious.
出处 《铁路节能环保与安全卫生》 2012年第2期72-76,共5页 Railway Energy Saving & Environmental Protection & Occupational Safety and Health
基金 铁道部科技研究开发计划(编号:2010Z003-D) 铁道科学技术研究发展中心项目(编号:J2010Z024)
关键词 复合垂直流人工湿地 总磷 水力负荷 integrated vetical flow constructed wetlands total phosphorous hydraulic loading
  • 相关文献

参考文献27

  • 1朱彤,许振成,胡康萍,马桂花,李华.人工湿地污水处理系统应用研究[J].环境科学研究,1991,4(5):17-22. 被引量:153
  • 2籍国东,倪晋仁.人工湿地废水生态处理系统的作用机制[J].环境污染治理技术与设备,2004,5(6):71-75. 被引量:93
  • 3吴振斌,谢小龙,徐栋,董金凯,贺锋,成水平,梁威,付贵萍.复合垂直流人工湿地在奥林匹克森林公园龙型水系的应用[J].中国给水排水,2009,25(24):28-31. 被引量:17
  • 4Sposito G. The Surface Chemistry of Soils[M].New York:Oxford Univeristy Press,1984.
  • 5Kalin M,Fyson A,Wheeler W N. The chemistry of conventional and alternative treatment systems for the neutralization of acid mine drainage[J].Science of the Total Environment,2006.395-408.
  • 6Braskerud B C. Factors affecting phosphorus retention in small constructed wetlands treating agricultural non-point source pollution[J].Ecological Engineering,2002.41-61.
  • 7Ahn C,Mitsch W J. Evaluating the use of recycled coal combustion products in constructed wetlands:an ecologiceconomic modeling approach[J].Ecological Modelling,2002.117-140.
  • 8Vymazal J. The use of sub-surface constructed wetlands for wastewater treatment in the Czech Republic:10 years experience[J].Ecological Engineering,2002,(05):633-646.doi:10.1016/S0925-8574(02)00025-3.
  • 9Tanner C C. Plants for constructed wetland treatment systems-A comparison of the growth and nutrient uptake of eight emergent species[J].Ecological Engineering,1996,(01):59-83.
  • 10吴建强,丁玲.不同植物的表面流人工湿地系统对污染物的去除效果[J].环境污染与防治,2006,28(6):432-434. 被引量:41

二级参考文献119

共引文献651

同被引文献22

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部