摘要
漳山发电公司捞渣机实施提速增容改造后,不仅解决了因渣量大幅增加、捞渣机出渣能力不足的问题,还降低了设备故障率,节约了检修成本。
The reforming project of scraping plate type eliminator for speeds raising and capacity enhancing in ZhangShan power plant,not only solves the problem of not enough removal of slag owing to largely increased slag,but also declines the malfunction rate of the equipments and saves maintenance cost.
出处
《中国科技信息》
2012年第9期127-127,共1页
China Science and Technology Information
关键词
捞渣机
提速
增容
改造
速度
eliminator
speeds raising
capacity enhancing
reform
speed